Monday 7 March 2016

Mobilising NEXUS TSRC Project Offices

Retracom Hire are mobilising to establish the Toowoomba Second Range Crossing (TSRC) project main office complex at the Mort St and Hermitage Rd interchange for Nexus. These facilities and several other satellite locations will be home to Nexus during the 40 month Design and Construction phase.

The TSRC is a bypass north of Toowoomba which ensures freight can be moved efficiently to and from the Darling Downs and greater Surat Basin region and significantly improves driver safety and community amenity by removing heavy vehicles from the Toowoomba Central Business District.

Acciona Infrastructure Australia and Ferrovial Agroman Australia are in the Nexus CJV for the design and construction of the project. Nexus is a committed to a ‘greater connection’ with the community, local industry and suppliers. Retracom are proud to be associated with the project and assist Nexus in achieving its local content targets. Our Toowoomba branch office at O’Mara Rd Charlton is located immediately adjacent the Warrego Hwy West connection (pictured) and this is where the building modules are being prepared before the short haul to site.


Construction is commencing now with the roadway scheduled to open in 2018.

3 comments:

  1. Thanks for the update on Warrego highway, the plan looks pretty good and i can't wait for it to be completed soon.

    ReplyDelete
  2. Hey great stuff nice info your passing on
    staples

    ReplyDelete
  3. Why hello there ?! Today, academic writing help from our essay writing company is on high demand globally as more students are seeking professional assistance for numerous research papers. Not many students can adhere to the strict standards of academic papers due to unavoidable circumstances.

    ReplyDelete